MCS Certified TrustMark Registered Free Site Survey Real Fixed Quotes Fully Insured

Why Solar Works in Essex

Why Essex

Sunshine, planning & conservation areas.

Essex is consistently one of the sunniest parts of the UK, and for most homes the planning rules work in your favour too.

Essex countryside farmland
Sunshine hours

One of the sunniest counties in the UK.

How much a solar system generates depends heavily on how much sunshine a location actually gets. Shoeburyness, in Southend-on-Sea, has recorded 1,884 hours of average annual sunshine, among the highest totals recorded anywhere in the UK, and well above the UK-wide average of roughly 1,403 hours. The wider South East typically sees 1,400–1,600 hours a year, itself above the national average.

In practice an Essex system should produce a little more electricity than the same one in a duller part of the country, and pay back faster. Your exact numbers depend on which way the roof faces, its pitch and any shading, so each quote starts with a site visit instead of a desktop estimate.

Shoeburyness average sunshine1,884 hrs/yr
South East regional average1,400–1,600 hrs/yr
UK-wide average~1,403 hrs/yr
Planning permission

Conservation areas and your roof.

Under permitted development, most Essex homes need no planning application for solar panels, provided they stay within 200mm of the roof plane and below the ridge. Essex has a number of conservation areas, including parts of Colchester, Chelmsford, Saffron Walden, Maldon and Thaxted. There, panels on a roof slope that does not face a public road are typically still permitted development, but panels visible from the road may need permission.

Essex also has over 14,000 listed buildings, concentrated particularly in Colchester, Chelmsford, Saffron Walden, Maldon and Thaxted. Installing solar on a listed building always counts as an alteration and needs listed building consent first, regardless of where the panels sit.

Conservation areas

Rear roof slopes not facing a public road are usually still permitted development.

Listed buildings

Listed buildings need consent whatever the usual permitted-development position.

Ground-mounted systems

Permission is needed if panels are over 4m tall, larger than 9m², or in a conservation area.

All of this is reviewed at your survey, which tells you exactly where the property stands before any work begins.

Ready when you are

Find out what your roof could generate

A free quote with no obligation, planning check included.

Step 1 of 6 Free & no obligation

Are you a homeowner or a tenant?

Please select an option to continue.

What type of property do you have?

Please select an option to continue.

Do you already have solar panels installed?

Please select an option to continue.

What are you interested in?

Please select an option to continue.

What's your postcode?

Please enter your postcode to continue.

Thanks, we'll keep this in mind.

Most of our installations need the homeowner's consent. If you're renting, feel free to share this with your landlord as we're happy to talk to them directly about fitting a system here.

Almost done. Where should we send your quote?

Please fill in your details and confirm both boxes to continue.

A free quote with no obligation, planning check included.